How to vision your lab project in one day

High-level visioning processes can be used in combination with practical approaches to create a vision in a day.

12/05/2016


Votes can be gathered in real-time while live voting results gives people the satisfaction of knowing that their voice is heard. Courtesy: CRBLaboratory projects can be extremely challenging and require a very thorough analysis. How do designers use knowledge of past projects to work with the client and create their vision? In many cases a high-level visioning process can be used in combination with practical approaches to create their vision in a day.

It all starts will a well-defined, laid-out plan. The vision and concept design can be created in a day, however, the pre-work is what will make the day successful. With careful advanced planning and use of interactive and visual tools, the process itself can build consensus and be fun for the groups involved.

In most projects, the project needs must carefully be considered. Is the project a consolidation effort? Does the business case require more utilization per square foot? After this information is gathered, it is necessary to work with the team in advance so the drivers and sensitive information can be understood fully throughout the process.

The following is a series of concepts and tools used for creating unique concepts.

PreRead: "only spend 1 hour". No one likes to fill out forms, but taking a short amount of time helps to everyone on the same page. Groups can share equipment and space which saves the project money.

Cost decisions can be built in real-time, and scenarios can be answered on the fly. Courtesy: CRBImaging: this is a great way to understand all aspects of the lab design from basic architecture to safety needs. After going through a silent voting session, the scores (1 being the best) are ranked and the consensus of what fits best is revealed.

Polling: everyone loves to use their phone. Votes can be gathered in real-time, and live voting results can be viewed. It gives people the satisfaction of knowing that their voice is heard, and it also proves what the main drivers are for a project.

Dashboard: this tool can save the project. By building cost decisions in real-time, scenarios can be answered on the fly. There is no excuse to schedule a meeting later.

Visuals: you don't need a degree in architecture to understand a picture. Wallpaper the meeting room with images, concepts, and examples to make provide more effective communication.

Schedule: the schedule for conducting the Kickoff Visioning session is broken down into 4 steps. The result is a consensus-built design generated from the entire team in a half-day session. 


-Mark Paskanik is a Senior Architect at CRB. This article originally appeared on CRBlogs. CRB is a CFE Media content partner.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me