High-performance medical and educational building design: HVAC

The design of high-performance medical and educational projects are challenging and need to meet specific standards, codes, and trends. There can be unique HVAC system requirements for high-performance buildings.

06/30/2016


Joseph A. D’Alù, PE, LEED AP, CEM, Division Manager, RMF Engineering,Charlottesville, Va. Courtesy: RMF EngineeringTG Davallou, LEED AP, Partner, Alfa Tech Consulting Engineers, San Francisco. Courtesy: Alfa Tech Consulting EngineersSean Donohue, PE, LEED AP, Director, Colorado Springs, Jensen Hughes, Colorado Springs, Colo. Courtesy: Jensen HughesAnthony B. Preteroti, Associate Vice President, CannonDesign, Grand Island, N.Y. Courtesy: CannonDesignTeresa Rainey, PE, LEED Fellow, Director of High-Performance Design, EYP Architecture & Engineering, Washington, D.C. Courtesy: EYP Architecture & Engineering

Respondents

Joseph A. D'Alù, PE, LEED AP, CEM, Division Manager, RMF Engineering, Charlottesville, Va.

TG Davallou, LEED AP, Partner, Alfa Tech Consulting Engineers, San Francisco

Sean Donohue, PE, LEED AP, Director, Colorado Springs, Jensen Hughes, Colorado Springs, Colo.

Anthony B. Preteroti, Associate Vice President, CannonDesign, Grand Island, N.Y.

Teresa Rainey, PE, LEED Fellow, Director of High-Performance Design, EYP Architecture & Engineering, Washington, D.C.


 

CSE: Have you specified distinctive HVAC systems on any high-performance campus projects?

Davallou: Yes, for all of the College of Marin projects including the main building; math and science buildings have geothermal HVAC systems.

CSE: What unique HVAC requirements do high-performance campus projects have that you wouldn't encounter in other projects?

Davallou: Geothermal systems will require a detailed well-test analysis and the water department's approval. For example, for the Mission College project's main building, we had to change the vertical-loop design to horizontal-loop during the construction administration because of leakage, which was not acceptable by the water department.

CSE: When retrofitting existing buildings for such projects, what challenges have you faced and how have you overcome them?

Davallou: We've seen space issues for thermal storage and geothermal. For Soka University, we looked at a void space near the central plant to locate the chilled-water thermal storage tanks.

 



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
June 2018
Chilled-water system design, NFPA 99, Grounded power supply systems
May 2018
40 Under 40 winners, fire and life safety, performance-based designs, and more
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me