When officials at the Audubon County Memorial Hospital in Audubon, Iowa, completed the facility's recent expansion, they soon realized they had neglected one vital element. Although power requirements at the 25-bed hospital had grown to 375 kW, their existing emergency standby generator could only supply 175 kW of electricity.

12/01/2003


When officials at the Audubon County Memorial Hospital in Audubon, Iowa, completed the facility's recent expansion, they soon realized they had neglected one vital element. Although power requirements at the 25-bed hospital had grown to 375 kW, their existing emergency standby generator could only supply 175 kW of electricity. This meant leaving some non-critical systems unprotected in the event of an outage or disruption, to ensure life-safety functions would not be compromised.

Required monthly tests of the equipment were also proving problematic. The hard transfer from utility to generator supplies caused a 3/16th of a second outage, which was enough to disrupt some clocks, lights, computers and security devices. As a result, maintenance staff had to alert all personnel prior to testing to ensure computers were backed up and other needed preparations were made.

To meet both supply and testing needs, facility managers decided a new generator system was in order, along with a load-transfer solution that addressed the brief outages they were experiencing when switching to generator power. Although they initially considered a 250-kW system, which would have met emergency-supply requirements, a utility demand-side management program provided the necessary financial incentives to think a little bigger.

The hospital installed a 600-kW diesel generator set that allows them to participate in a load-shedding program established by the local electric utility. Not only is the hospital fully protected in case of outages, it also is able to quickly separate itself from the grid up to 16 times a year during summer peak periods. This latter capability earns the hospital up to $11,000 in savings annually.

To ease the load's transition from utility to generator, the hospital included a soft-loading transfer switch in its plans. With this design, the utility and generator operate in parallel for about five seconds as load gradually shifts from one system to the other, eliminating the voltage and frequency dips of the previous hard-transfer scheme.





Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
June 2018
Chilled-water system design, NFPA 99, Grounded power supply systems
May 2018
40 Under 40 winners, fire and life safety, performance-based designs, and more
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me