Grid-tied photovoltaic inverter

Carlo Gavazzi ISGA Series of grid-tied PV inverters

12/29/2011


Carlo Gavazzi ISGA Series of grid-tied PV invertersCarlo Gavazzi's ISGA Series of grid-tied photovoltaic (PV) inverters feature a transformerless design, which does not incorporate or require a cooling fan.

The ISGA Series are available in 2-kW, 3-kW, 4-kW and 5-kW output sizes with a 240-Vac, 60-Hz single phase output and 6 kW to 15 kW, 120/208 Vac Wye or 240 Vac Delta, 3-phase 60 Hz output. The inverter has an output efficiency up to 96.4%, with CEC ratings up to 95.5%. The ISGA Series inverter has an input voltage range of 150 Vdc to 450 Vdc, allowing customers to realize an increase in ac production time. Some models also offer the ability to connect two individual MPP inputs. The input is protected from overvoltage, ground faults, reverse polarity, and surges.

The ISGA Series inverters feature a user-friendly LCD display and are easily installed via a quick-mount bracket. The built-in combination ac/dc disconnect switch also allows for quick installation without the need for a separate externally mounted disconnect switch. They have an environmentally robust and durable powder coated metal housing, with a NEMA3R outdoor rating, and can operate from -4 F to 122 F (-25 C to 50 C). The inverters also come standard with an RS232 output. RS485, Ethernet, USB and Web Server capabilities are available as options.

The ISGA Series are CE marked and ETL approved to meet these standards: UL1741, IEE1547/IEE1547.1, CAN/CSA STD C22.2 No 107.1, FCC Part 15, Class A and B.

www.gavazzionline.com



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me