As an integrated health-care system, Fairview's six community hospitals, academic medical center, children's hospital, 31 primary care clinics, 25 specialty clinics, four urgent-care clinics and specialty service centers across the state of Minnesota provide a complete range of health-care services.

In partnership with University of Minnesota Physicians, Fairview plans to open the Maple Grove Outpatient Specialty Care Center in 2007, a 135,000-sq.-ft. specialty care center that comprises six operating rooms, a diagnostic center, a cancer center and outpatient clinic.

Fairview, Walker and Assocs.—the owner's representative—and the M/E/P firm, Hammel, Green and Abrahamson, Inc., Minneapolis, decided that the mechanical systems and equipment would be dedicated to serving the Phase I ambulatory care center, with space allotted for a central plant to house the heating plant, water-cooled chillers, cooling towers and other equipment to meet the future building's needs. The present system will then be tied into the central plant.

Fairview used an objective approach and decision-making matrix to select among four options for the mechanical system:

Option 1: Rooftop units (RTUs), with cooling provided by a refrigerant cooling coil, compressor and air-cooled condensing unit; gas-fired heating; and ventilation in one package; with screening.

Option 2: Improved RTUs with an integral hallway for each RTU to provide better access to the roof and enable maintenance to be performed indoors.

Option 3: Rooftop-level air-handling units (AHUs) providing ventilation, with cooling provided by a cooling coil and basement-level chiller, and heating provided by a heating coil and basement-level boiler.

Option 4: Similar equipment to Option 3, but with the AHU located in the basement, with shafts for outside air and relief air.

The building user group and members of HGA's project team identified and weighted 12 financial and performance criteria, which included several high priorities: patient and staff safety; patient and staff comfort; initial cost; energy efficiency/payback; flexibility for vertical expansion; and sustainable design. HGA developed early schematic designs of each of the four options, and Walker and Assocs. and Knutson Construction Services, Minneapolis, developed construction estimates.

Option 1 offered the lowest initial cost, fast installation and a single equipment package, but came with higher life-cycle costs, lower energy efficiency and increased labor cost for maintenance when compared with the other options. Option 2 offered a moderate initial cost, with lower maintenance costs and higher-quality equipment, yet energy efficiency and life-cycle costs remained drawbacks. Option 3 offered better life-cycle costs than Options 1 or 2, yet it was the most expensive and reduced future flexibility for vertical expansion.

The decision-making process was complicated by the prospect of the Phase II addition. The group recognized that Options 1 and 2 were priced to qualify as "throwaway" systems when Phase II is implemented, but not Option 3. Moreover, if Phase II were to be built above Option 3, potentially costly structural modifications would be required.

The user group, project team, architect and Fairview executive-level leaders ultimately chose Option 4 because it combined reasonable initial cost, good life-cycle cost and flexibility.

Criteria Weight Option 1: Rooftop units Option 2: Rooftop units w/access Option 3: Penthouse AHUsw/central plant Option 4: Mech. room w/central plant
Patient comfort and safety 25%22.72.72.7
Flexibility and future growth 25%12.52.54
Low first cost 25%4222
Energy efficiency 10%1333
Maintainability 5%1234
Aesthetics 5%1135
Integration w/floor plan 5%3331
Total unweighted 13 16.2 19.2 19.6
Total weighted 2.1 2.4 2.5 3





Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me