exp: Northside Hospital Forsyth vertical expansion and central plant addition

Electrical, power; HVAC, mechanical; plumbing, piping.

08/10/2017


Exterior of the hospital. Courtesy: exp; Harlan Hambright, photographerEngineering firm: exp

2017 MEP Giants rank: 11

Project: Northside Hospital Forsyth vertical expansion and central plant addition

Address: Cumming, Ga.

Building type: Hospital/health care facility

Project type: Addition to existing building

Engineering services: Electrical, power; HVAC, mechanical; plumbing, piping

Project timeline: February 2015 to December 2016

MEP/FP budget: $510,000

Exterior of the hospital. Courtesy: exp; Harlan Hambright, photographer

Challenges

One of the main challenges of the project was enclosing the existing roof and converting it into a mechanical floor. This was complicated in several ways; for example, the existing rooftop air handling units (AHUs) had to be retrofitted to be able to handle the additional static pressure of ductwork on the outside air intakes.Since the floor was now enclosed, the “relief air” had to be dealt with as well.

Adding ductwork on the relief outlet of the AHUs would have added even more cost to the project. Additionally, existing exhaust fans on the old roof had to be relocated to the new roof and then adjusted to handle the additional static pressure of three additional floors of ductwork.

Solutions

For the existing AHU retrofits, the return fans were modified to increase their horsepower and therefore assist with the intake of outside air through the new ductwork.

The relief didn’t need to be ducted because project leaders used the entire new mechanical floor as a “relief air plenum” with perforated walls to allow the floor to be positively pressurized. This reduced the cost of construction by eliminating the need for new ductwork on two existing and two new AHUs. Motor horsepower increases allowed the exhaust fans to deal with the additional static pressure.

A patient room in the hospital. Courtesy: exp; Harlan Hambright, photographer A waiting room/lounge in the hospital. Courtesy: exp; Harlan Hambright, photographer



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
August 2018
MEP Giants, lighting designs, circuit protection, ventilation systems, and more
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me