Back in the 1980s, when I was a computer science student, I was taught that a good systems designer would design him- or herself out of the system. This meant that the system worked, it was well documented, operators were well trained, and the system could be maintained. The system designer, like a house builder, could close the door on a project with a clear conscience and whistle while walking away, content with a job well done.

In the world of energy efficiency, there's a word for that: persistence. Persistence is the ability of an energy conservation measure (ECM) to last—for the energy, financial, and carbon savings to accrue over time, as planned. In the parlance of systems engineering, energy engineers will round off an ECM project with persistence measures with performance benchmarks, documentation, and training.

To do anything less, engineers are shortchanging owners because the ECM won't last long, thus undermining the integrity of any cost-benefit analyses performed that led to the ECM. It's like selling a car without oil or transmission fluid. The owner might get the car out of the lot, but it won't be long before the car ceases to function.

But how far should persistence measures go? The answer is that it depends on the ECM. A study by Portland Energy Conservation Inc. (PECI) and Texas A&M University on persistence of repairs stemming from commissioning buildings found that persistence has a signature: ECMs impacting the surface of systems, like thermostat setpoints and set-back schedules, were changed to accommodate immediate needs for comfort or lighting, and sometimes were not changed back to original settings. On the other hand, ECMs made deep into a system—such as trimming a pump impeller, changing control software code, or replacing a chiller—had stronger persistence. Knowing about this signature can help you with persistence planning.

Research conducted by Consulting-Specifying Engineer for the MEP Giants report on page 20 found that commissioning (Cx) and maintenance/repair/operation (MRO) services are on the rise among engineering firms. A lot of this work is energy related, as discussed in my Viewpoint last month, "There's gold in building performance data." Engineers entering into the Cx and MRO markets need to be aware that persistence is important to building owners and program managers dispensing capital budgets and rebates. Based on the wisdom from energy conservation programs spanning 30 years, projects increasingly are requiring that ECM cost-benefit analysis include persistence measures such as documentation, training, scheduled maintenance, and ongoing/continuous Cx.

Please visit my Give and Take blog at www.csemag.com/blog , where I have posted this Viewpoint along with hyperlinks to reports and presentations on persistence that can will help you build persistence measures into your energy and environmental projects.

Send your questions and comments to: Michael.Ivanovich@reedbusiness.com





Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me