Energy audits, Cantor Art Center, Cecil H. Green West Library

System overhaul: Energy audits, Cantor Art Center and Cecil H. Green West Library; Salas O'Brien

08/09/2012


Cantor Art CenterProject name: Energy audits, Cantor Art Center and Cecil H. Green West Library

Location: Stanford, Calif.

Firm name: Salas O'Brien

Project type, building type: System overhaul, art/museum venue

Project duration: 4 years

Project completion date: Nov. 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $367,800

Engineering challenges

The projects were challenging to implement in an operational facility. Each system had to be done one at a time so that the entire building was not affected. Because these historic buildings were not built in a humidity-controlled space, they dry out quickly once they are shut down and take a substantial amount of time (more than a week) to reach steady state again after start-up. This amplified the need to have redundancy in the new systems. Commissioning lasted several months as the new systems dynamics were learned by the in-house EMCS staff along with finding problems with existing equipment. This also was a cultural change given the learning of new sequences based on dew point instead of relative humidity.

Rodin Garden Cecil H. Green Library, image of exterior (Click to enlarge)Solutions

Stanford University, as part of its energy program, targeted two historic buildings for energy audits—Cantor Art Center and Cecil H. Green West Library—due to their relatively high energy usage when compared to other buildings. The audit focused on a few energy projects and was followed by design and construction of these projects. Now that these have been installed for a full year, through measurement and verification, savings of over $500,000/year have been proven. Mechanical systems in the buildings consisted of constant volume central station air handling units (AHUs) with fixed outside air, humidification, chilled water, and reheat coils. These AHUs were controlled by an energy management and control system (Rosemont). The control sequences were standard for this type of application. Modulating the chilled water coil and heating coil depending on demand controlled zone temperatures, and modulating the chilled water for dehumidification and the steam-to-steam humidifier for humidification controlled zone humidification. Trending of this data revealed hunting of both temperature and humidity.

Additional Information 

View a presentation from Salas O'Brien on the project



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
August 2018
MEP Giants, lighting designs, circuit protection, ventilation systems, and more
July 2018
Integrating electrical and HVAC systems, emerging trends in fire, life safety, ASHRAE 90.4
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me