Electrical, power in industrial facilities

The Consulting-Specifying Engineer 2016 Electrical and Power Study indicated that 56% of engineers specify, design, or make product selections for industrial/manufacturing facilities/warehouses.

10/14/2016



Having an inadequate budget for a high-quality design (77%) and the client’s desired project delivery time frame (72%) are the most difficult challenges engineers face in electrical or power systems and design for industrial facility projects. Courtesy: CThe Consulting-Specifying Engineer 2016 Electrical and Power Study indicated that 56% of engineers specify, design, or make product selections for industrial/manufacturing facilities/warehouses—and seven in 10 of these engineers are responsible for determining requirements/writing specifications and/or supervising or consulting for these projects. Below are five electrical and power findings as they relate to industrial facility projects:

1. Annual specified products value: The average engineering firm specifies $3,137,000 in total electrical or power systems for new and existing industrial facilities annually, with 39% specifying more than $5 million.

2. Issues affecting future designs: The most critical issues affecting the future of electrical or power systems in industrial facilities are the lack of a skilled workforce (22%) and budget/costs (22%).

3. Products specified: Circuit breakers, fuses, etc. (81%); transformers (79%); electrical distribution (74%); and power and standby power systems or equipment (73%) are most commonly specified for industrial facility projects.

4. Selection factors: When comparing electrical or power systems for industrial facility projects, engineers are most interested in product quality (81%), service support availability (57%), a manufacturer’s reputation (50%), previous experience with a manufacturer (44%), and the product’s technical advantage (42%).

5. Specifications: For industrial facilities, engineers most often write performance (79%), prescriptive (72%), or open (alternate or substitute, 59%) specifications.

 

 

 


The average firm specifies more than $700,000 annually in lighting and lighting control products for new and existing buildings. Source: Consulting-Specifying Engineer 2015 Lighting and Lighting Controls Study

77% of mechanical engineers regularly specify air-balancing, test-and-balance, or environmental-balancing building systems. Source: Consulting-Specifying Engineer 2015 HVAC and Building Automation Systems Study

2/3 of fire protection design engineers are challenged with inadequate budgets for proper fire and life safety system design. Source: Consulting-Specifying Engineer 2016 Fire and Life Safety Study

$7.6 million: Average annual mechanical, electrical, plumbing/fire protection (MEP/FP) design revenue earned by firms specifying electrical or power systems in 2015. Source: Consulting-Specifying Engineer 2016 Electrical and Power Study

View more information at www.csemag.com/2016ElectricalPower. Amanda Pelliccione is the research director at CFE Media. Consulting-Specifying Engineer covers several research topics each year. All reports are available at: www.csemag.com/research.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Knowing when and how to use parallel generators
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me