Engineering firm: Chinook Systems Inc.

2018 Commissioning Giants rank: 14

Project: Pentagon Commissioning Specialist Services

Location: Washington, DC, United States

Building type: Government building/military facility

Project type: Existing building retrofit

Engineering services: Automation, controls; commissioning, retro-commissioning; electrical, power; energy, sustainability; HVAC, mechanical; lighting; plumbing, piping; and cybersecurity

Project timeline: April 2011 to March 2016

Commissioning budget: $7,500,000

 

Challenges

The Pentagon Reservation is a challenge in its sheer size, the number of divisions that are required to be supported, the quantity of concurrent projects that need to be executed, and the quantity and complexity of systems and equipment to be commissioned. Projects range from central utility plant and associated distribution, building envelope/pressurization, computer and technology data centers, secure office and conference centers, laboratories, emergency operations centers, switch house/substations, athletic/fitness, delivery facilities, food services/retail facilities, and vehicle access control and perimeter security. All of these factors impact the ability to continuously improve processes, optimize system performance, and increase energy efficiency.

Solutions

Never satisfied with status quo, Chinook Systems Inc. has always strived to proactively push the Pentagon's commissioning program forward. Chinook standardized the overall commissioning process managed in the enterprise level commissioning software application, Quicx and provided real-time, transparent delivery of their services at all phases of each project. Chinook provided to the Pentagon a complete set of master documents for each type of equipment and system installed on the reservation. This approach has significantly saved time on the development of documentation and ensured that there was consistent delivery from one project to the next. Chinook automated the process of transitioning commissioning data to the computerized maintenance management system.

Through the ongoing commissioning process, Chinook developed the Ongoing Cx Plan and coordinated their work with other government contractors. Chinook investigated troubled areas, performed condition assessments and energy audits, resolved operational problems, improved comfort, and optimized energy use. In addition, Chinook led an outside air reduction project to reduce OA to current codes and standards, optimize sequence of operations, and reduce building pressurization issues. Chinook was an active participant in many on-going energy related projects, including sub-metering and steam trap monitoring, and developed rule sets for fault detection analytics through the Iconics controls system for all major equipment types.



Product of the Year
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
40 Under Forty: Get Recognized
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
MEP Giants Program
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
November 2018
Emergency power requirements, salary survey results, lighting controls, fire pumps, healthcare facilities, and more
October 2018
Approaches to building engineering, 2018 Commissioning Giants, integrated project delivery, improving construction efficiency, an IPD primer, collaborative projects, NFPA 13 sprinkler systems.
September 2018
Power boiler control, Product of the Year, power generation,and integration and interoperability
Data Centers: Impacts of Climate and Cooling Technology
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
Safety First: Arc Flash 101
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
Critical Power: Hospital Electrical Systems
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Data Center Design
Data centers, data closets, edge and cloud computing, co-location facilities, and similar topics are among the fastest-changing in the industry.
click me