Case study: Graton Casino and Resort

Backup power design for a high-performance building is required, and offers many benefits.

01/02/2018


Graton Casino and Resort in Rohnert Park, Calif., uses three 1,500 kW/1,875 kVA, 480 V 3-phase parallel generators as a robust emergency/optional standby system (see Figures 2, 3, and 4). The generators are located outside of the building and are equipped with pad-mounted transformers to step up the generator output voltage from 480 to 2,160 V.

Table 2: Maximum demand-load table

Graton Casino and Resort

 

Maximum demand load

 

Remarks

 

Entire property

 

4,392 kVA at 0.85 power factor

 

Expected load

 

Maximum base-load total

 

4,392 kVA

 

 

 

+ 20% contingency

 

879 kVA

 

For unforeseen future load growth

 

Total load

 

5,270 kVA or 141 amps at 21.6 kV 3-phase

 

 

 

Source: FEA Consulting Engineers

The priority loads include:

A. Priority 1 (emergency and legally required standby power).

1. Loads will be picked up by generators upon loss of utility power within 10 seconds.

2. Loads include:

a. Fire pumps.
b. Fire sprinkler air compressors.
c. Fire alarm.
d. Egress lighting.
e. Elevator cab lighting.
f. Elevator room cooling.
g. Tower guestroom toilet exhaust.
h. Tower supply fan.
i. Tower obstruction lighting.
j. Water-treatment plant.

B. Priority 2 (business critical/optional standby power).

1. Second set of loads picked up by generators upon loss of utility power within 60 seconds.

2. Loads include:

a. Select central plant equipment.
b. Boilers and water heaters along with associated pumps.
c. Booster pumps.
d. Air handler units.
e. Information technology cold room.
f. Surveillance cold room.
g. Telecommunication rooms.
h. Cooling for cold rooms.
i. Cooling for electrical rooms that contain optional standby equipment.
j. Slots.
k. Kitchen walk-in coolers and freezers.
l. Select lighting in BOH areas.
m. Lighting over gaming tables and at the cage.
n. Select site lighting.
o. Power for exterior cameras.

C. Priority 3 (normal power).

1. Third set of loads picked up by generators upon loss of power on a load-permissive basis.

2. Loads include:

a. Remaining central plant equipment.
b. High-limit area.
c. Event center.
d. Food court and restaurants.

D. Priority 4 (normal power).

1. Fourth set of loads picked up by generators upon loss of power on a load-permissive basis.

2. Loads include:

a. Select bars and restaurants.
b. Event-center kitchen.
c. Pool area and spa.


Michael Villalba is a designer with FEA Consulting Engineers. He previously worked for NV5. He has 3 years of experience working on projects such as convention centers, casinos, hotels, and photovoltaic farms.

 



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Developing lighting solutions; Designing lighting systems; Integrating fire alarm and HVAC systems
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
Knowing when and how to use parallel generators
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me