AHU Specification: The Case for Performance-Based Design

Writing specifications for high-performance air-handling units (AHUs) used to mean detailing cumbersome construction requirements, accompanied by long lead times and a high price. Today, it is possible to spec AHU performance—not construction—for custom units that are produced economically and quickly.

01/01/2005


Writing specifications for high-performance air-handling units (AHUs) used to mean detailing cumbersome construction requirements, accompanied by long lead times and a high price. Today, it is possible to spec AHU performance—not construction—for custom units that are produced economically and quickly.

There have always been facilities that required high-performance AHUs, such as hospitals, cleanrooms, pharmaceutical manufacturers and performing-arts theaters. These facilities have unique needs regarding AHU capacity, acoustics, casing integrity and/or thermal capability. For consulting engineers, it is a large and important market.

However, the AHU market is changing. Organizations such as ASHRAE, U.S. Green Building Council, International Code Council and others are actively addressing indoor air quality, energy and acoustics by setting performance standards for air handling. Virtually all buildings today have stringent requirements for air-handling performance. These higher standards are creating challenges for designers by requiring custom AHUs, which historically are more time-consuming to specify, are more expensive and require longer lead times.

To address these challenges, some AHU manufacturers are now applying mass-customization techniques that have been successful in other industries such as personal computers. This approach allows the manufacturer to combine the economies of large-scale production with the ability to build custom-designed and manufactured products to meet the specific needs of each customer. It also allows unprecedented flexibility in AHU dimensions, materials and components. The result is a high degree of AHU customization, with individual units built cost-effectively and shipped quickly.

This new generation of AHUs no longer requires the consulting engineer to specify unit construction to ensure required performance. Specifying construction is usually proprietary and therefore limits competition. In fact, specifying construction places the liability for performance on the designer rather than the manufacturer.

The solution, however, is at hand: Consulting engineers should write performance-based AHU specifications that are tied to industry standards. Where standards don't exist, engineers should require testing and written guarantees. In other words, place the burden on manufacturers to ensure performance and deliver a cost-effective AHU within reasonable lead times.

In addition to saving design time and minimizing risk, the engineer can actually increase competition for a project bid. That's because specifying performance is not proprietary; it levels the playing field for competing manufacturers.

Raising the bar

The design community continues to raise the AHU performance bar to improve the safety, health and welfare of the public. Consulting engineers can use performance-based specifications to deliver outstanding performance and flexibility to the exact requirements of the customer. Equipment manufacturers who wish to meet customers' expectations will continue to innovate, with practices like mass-customization of AHUs.



Performance-based advantages

Reduced design time

Minimized risk

Increased bid competition



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me