A/E Billing Rates Rise, but Slowly

Despite recent economic challenges, hourly design firm billing rates have increased 10% over the last three years, according to a recent survey by the Natick, Mass.-based industry consulting firm ZweigWhite. While hourly billing rates continue to rise, the increase has leveled off. Last year's survey indicated a 12% increase over the previous three-year period, and the 2001 survey reported a 12.

06/01/2003


Despite recent economic challenges, hourly design firm billing rates have increased 10% over the last three years, according to a recent survey by the Natick, Mass.-based industry consulting firm ZweigWhite.

While hourly billing rates continue to rise, the increase has leveled off. Last year's survey indicated a 12% increase over the previous three-year period, and the 2001 survey reported a 12.5% increase.

"While it's encouraging to see that billing rates increased, the lower amount of the increase compared to previous years may reflect the economic and competitive pressures being felt at the time," says Ian Rusk, ZweigWhite's CFO and a financial consultant to the industry. "Unless the economy improves significantly in the near term, I would not be surprised to see even smaller billing rate increases this year."

"We are seeing more and more firms struggling with declining revenue, profits and cash flow, and it's taking a toll on the principals of those firms," adds Mark C. Zweig, ZweigWhite's president/CEO.

ZweigWhite also reported that construction spending rose in January for the fifth consecutive month. According to the U.S. Census Bureau, total put-in-place construction was estimated at a seasonally adjusted rate of $877.9 billion—1.7% above the revised December estimate. While residential spending, a major catalyst for the strong growth, was up 4.1% from December, non-residential construction continued to fall, declining 0.3% to a seasonally adjusted annual rate of $157.9 billion.





Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me