Timing is everything

Engineers must consider arc flash prevention in the electrical systems. How important is timing?

03/28/2013


Because an arc flash relay depends on an existing circuit breaker to interrupt the current, does it make a difference in overall reaction time? And if the relay must wait until an arc forms, will the relay take longer to trip than the circuit breaker would trip on its own? Finally, how does the reaction time of an arc flash relay compare to an overcurrent protection relay? 

Circuit breakers must react somewhat slowly to low-level faults; otherwise, they would nuisance trip. Arc flash relays avoid nuisance tripping by sensing light. Light is present even at the early stages of an arc flash. 

The current drawn by an arc flash event will vary depending on circumstances; a tool across two live phases will have very low resistance and may draw as much current as a bolted short, while a momentary ground fault can have much higher resistance and may draw only 1/3 the current of a bolted short. If the arcing fault current is less than the instantaneous trip level of a circuit breaker or overcurrent protection relay, then it falls into the short-time trip on the overload curve. In contrast, an arc flash relay detects the light from an emerging arc flash and sends a trip signal to the existing circuit breaker in approximately 1 ms. 

After receiving a trip signal from an arc flash relay, a typical circuit breaker used in switchgear or a motor control center may take about 50 ms to open, depending on make and model. This is the breaker’s mechanical clearing time and is the same or slightly less than the time it takes for it to react to a high-value fault. But many arcs begin as fairly low value faults that draw less than the breaker’s instantaneous trip current, and only reach that level after several milliseconds. An arc flash relay will detect an arc as soon as it begins and trigger the breaker directly, reducing the time to clear the fault to the arc flash relay’s 1-ms response time plus the breaker’s mechanical clearing time. Because arc flash incident energy grows exponentially with time, those saved milliseconds can make the difference between damage that is hardly noticeable and a catastrophe.

A similar comparison can be made with an overcurrent protection relay. Compared to the 1 ms reaction time of an arc flash relay, a typical overcurrent protection relay can take between 25 and 45 ms to detect a fault and send a signal to the circuit breaker. A digital or numeric overcurrent protection relay requires time for sampling the signal, conversion to digital, calculation and operation of an output, while an analog unit (still found in many older installations) may take many ms, depending on make, model, and the type of fault. And either type, even when set to its shortest possible time, will still take several milliseconds to respond.

Do arc flash relays really work? What’s your opinion? Join the conversation below. 


Justin Mahaffey is sales engineer for Littelfuse, where he helps customers improve uptime and worker electrical safety. His experience includes heavy industrial applications such as oil and gas drilling and electric power utilities. Early in his career, Mahaffey worked as both a test and product engineer.



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Exploring fire pumps and systems; Lighting energy codes; Salary survey; Changes to NFPA 20
How to use IPD; 2017 Commissioning Giants; CFDs and harmonic mitigation; Eight steps to determine plumbing system requirements
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me