Michael P. Sheerin, P.E., Healthcare Division Director, TLC Engineering for Architecture, Orlando

Articles

Healthcare Facilities November 1, 2003

Facility Assessment – An Early Look Can Prevent Unpleasant Surprises Later

Time is money. An engineer can speak no truer words. Apart from knowledge and experience, judicious use of time is the only other thing that an engineer can apply to accomplishing a successful project. Conversely, the misuse of time can mean trouble. When an engineer is assigned a project, he or she juggles myriad documents and forms that must be completed within a deadline set by others.

By Michael P. Sheerin, P.E., Healthcare Division Director, TLC Engineering for Architecture, Orlando