March 1, 2007
UPS Module Selection for Large Scale Data Centers
In specifying uninterruptible power supply (UPS) systems for the large-scale mission-critical facility, the first step is to determine the amount of load the UPS system will serve. Once load is determined, it is essential to determine the amount of redundancy that is required. System redundancy can be developed through the servers in your critical environment, typically referred to as “g...
By Keith Lane, P.E., RCDD/NTS Specialist, TPM, LC, LEED AP Director/VP - Engineering SASCO,Seattle