Karl Stum, PE, Summit Building Engineering, Vancouver, Wash.
Articles
Other Building Types
November 18, 2009
Whole-building shutdown tests
Properly specifying how to conduct an intentional power outage and recovery reduces risks and increases the likelihood this critical test is performed.
By Karl Stum, PE, Summit Building Engineering, Vancouver, Wash.