Karl Stum, PE, Summit Building Engineering, Vancouver, Wash.

Articles

Other Building Types November 18, 2009

Whole-building shutdown tests

Properly specifying how to conduct an intentional power outage and recovery reduces risks and increases the likelihood this critical test is performed.

By Karl Stum, PE, Summit Building Engineering, Vancouver, Wash.
All Articles