CRB

Articles

Other Building Types August 12, 2020

Advice on wet and dry labs from lab design experts

As technology and testing advance, wet labs and dry labs have become more interconnected, but these spaces still have fundamentally different purposes and design considerations.

By CRB
Industry News August 3, 2020

10 tips for operating construction sites during the COVID-19 pandemic

In the era of COVID-19, construction companies across America are trying to find the best way forward. 10 challenges every construction organization has to deal with are highlighted.

By CRB
Other Building Types July 20, 2020

Lab design techniques to accelerate COVID-19 test processing

Testing is a crucial component of our global response to COVID-19 and producing enough tests processing the results quickly to the public is a challenge we currently face.

By CRB
Safety July 13, 2020

Seven steps to plan for re-entering the workplace

When people return to the office after the COVID-19 pandemic has subsided enough, it is important to have a concrete plan in place during those early days to enhance safety and worker confidence.

By CRB
Buildings February 21, 2020

Vivarium renovation planning and design

The University of Texas at Arlington (UTA), a Tier I Research University, wanted to develop a barrier suite within its existing vivarium facility.

By CRB