Video: Case Study Using a Variable Flow Chiller in a Central Plant

This presentation will cover an overview of the system operation with three 1250 ton chillers and an overview of the bypass system and how to size bypass valves.

By Gaylon Richardson, TBE, CxA, Engineered Air Balance Co., Inc. January 15, 2019

Video Courtesy: CxEnergy 2018

Presenters: Gaylon Richardson, TBE, CxA, Engineered Air Balance Co., Inc.

Abstract: This case study covers a central plant serving chilled water to Air Handling Units in the central plant, a medical office building, and a hospital. This presentation will cover an overview of the system operation with three 1250 ton chillers and an overview of the bypass system and how to size bypass valves. Attendees will learn why the owner and engineer wanted to add a temporary chiller.


Video: Case Study Using a Variable Flow Chiller in a Central Plant

November 16, 2018