University Health System—Trauma Tower, Central Plant Expansion
New construction: University Health System—Trauma Tower and Central Plant Expansion; TMAD Taylor and Gaines (TTG)
Project name: University Health System—Trauma Tower and Central Plant Expansion
Location: San Antonio, Texas
Firm name: TMAD Taylor and Gaines (TTG)
Project type, building type: New construction, hospital
Project duration: 4.5 years
Project completion date: January, 2014
Project budget for mechanical, electrical, plumbing, fire protection engineering only: $150 million
Engineering challenges
One of the challenges encountered was to deliver all air handling unit condensate to the cooling tower as makeup water.
Solutions
We overcame this challenge by providing collection tanks on each level of the hospital that contained air units. A separate line was then routed to the common cooling tower basin from each collection tank. This allowed the use of existing elevation to move the water to the cooling towers basin, without pumps and without overflowing air units or tanks at lower levels.