Lean IPD strategies from the trade partner perspective

A lean integrated project delivery (LIPD) approach resulting in a collaborative and transparent approach that delivers increased value and benefits to the owner. 

By Andrew Rhodes March 9, 2020

Building owners are transforming the construction industry with the increased adoption of a lean integrated project delivery (LIPD) approach. This methodology breaks down the silos that are created during traditional construction, resulting in a highly collaborative and transparent approach that delivers increased value and benefits to the owner.

These benefits all start with team selection. Players should be chosen based on behaviors – not cost – asking about their willingness to learn and ability to innovate during the interview process. It’s also important that the people who will work on the project participate in the selection. Teams should choose people, not logos.

While company alignment is necessary, personal alignment is paramount. Team chemistry matters. The foundation for a successful integrated project delivery team is built through trust and respect. The goal is to create a true team comprised of partners, all of whom view and treat one another as equals. This allows us to embrace a truly shared value proposition.

Timing matters, too. Trade partners should be selected very early in the project lifecycle. As a project progresses, the team’s ability to affect project outcomes declines and the cost of making changes increases. Early involvement means the partners can identify major opportunities and risks and work tirelessly during the validation phase to capture the former and mitigate the latter. It also allows the team to analyze opportunities for prefabrication and modular construction, increasing workflow predictability, safety and quality while reducing labor costs.

Once the team is selected, the focus should turn to creating the right behaviors and environment. Conditions of Satisfaction, determined by all parties involved, are established so everyone knows how the team will define success moving forward. In order to ensure the team is moving in the right direction, we believe in continuous onboarding. This ensures that every single person involved in the project:

  • Knows the conditions of satisfaction
  • Understands the expected behaviors when interacting with the team.

Additionally, frequent team health checks, where we ask all members of the team for feedback, allow us to monitor our progress and ensure we are behaving correctly. While discussing behaviors, it’s important to talk about contract type. While many different types can be used, a multi-party Integrated Form of Agreement (IFOA) is the best option.

This contract, where all signatory parties participate in a shared risk/shared savings pool, creates an environment where we all win or lose together. This “skin in the game” approach enables the necessary levels of collaboration and encourages the right types of behaviors. We make decisions based on what adds value to the project, not what’s best for ourselves.

Once the right environment is created, where the right team, behaviors and contract are in place, the project team is on a path where the project can be delivered with maximum value to the owner. We leverage target value design, using continuous, conceptual estimating to ensure that cost is an input to design. This flips the traditional process on its head, allowing designers to design to a budget. It also allows the owner to make informed decisions, ensuring they get the most out of their money.

This approach has created success on many of our recent projects. In one example, Southland’s sprinkler fitters collaborated with the project’s steel erector to install fire protection piping in panelized roof joists at the ground level. The erector then lifted our system into place with the roof system. The results were increased safety (60% less time spent on lifts) and triple the anticipated labor productivity with zero sacrifice in quality. Another example was taking a Lean approach on a project’s piping systems. We worked together with the process engineer and structural engineer to create a right-sized, two-tiered pipe rack system that was more efficient than what the owner had previously installed. Capturing this opportunity created approximately $500,000 in project savings.

These are just two examples of what can be accomplished when an owner adopts a LIPD approach. The highly collaborative and transparent nature of LIPD teams, rooted in trust and respect, drives innovation. When team members view each other as partners, collaborate, and make decisions based on what’s best for the project, we can maximize the value we provide for building owners and create positive project outcomes.