exp: Trump International Hotel
Automation, controls; electrical, power; HVAC, mechanical; energy, sustainability; plumbing, piping.
Engineering firm: exp
2016 MEP Giants rank: 14
Project: Trump International Hotel
Location: Washington, D.C.
Building type: Hotel/motel/resort
Project type: Historical renovation/luxury hotel
Engineering services: Automation, controls; electrical, power; HVAC, mechanical; energy, sustainability; plumbing, piping
Project timeline: September 2012 to September 2016
MEP/FP budget: $900,000
Challenges
This project involved converting a historic post office that was being used as an office building into a luxury hotel. Coordination with all the historic elements and installing/hiding the mechanical, electrical, and plumbing (MEP) systems to minimize the impact on the historic fabric created numerous challenges.
Solutions
Converting an office building to a hotel required a significant change to the HVAC and plumbing system. Cutting typical holes and chases into each floor for vertical risers was costly and led to a design that integrated significant amounts of horizontal distribution.
Do you have experience and expertise with the topics mentioned in this content? You should consider contributing to our WTWH Media editorial team and getting the recognition you and your company deserve. Click here to start this process.