CDM Smith: Indianapolis Airport Electric Vehicle Charging

Electrical, power; vehicle charging station; and existing building retrofit
By CDM Smith August 9, 2018

Interior view looking up under the two cooling tower fans.Engineering firm: CDM Smith

2018 MEP Giants rank: 63

Project: Indianapolis Airport Electric Vehicle Charging

Location: Indianapolis, Indiana, United States

Building type: Electric vehicle charging station

Project type: Existing building retrofit

Engineering services: Electrical, power

Project timeline: June 2016 to December 2017

MEP/FP budget: $123,340

Challenges

The retrofit of the electric system to accommodate the electric vehicle charging infrastructure was a challenge for this project.

Solutions

CDM Smith’ssolution was to develop a detailed design using a preselected charging infrastructure vendor and to perform a detailed investigation of the existing infrastructure.

Interior view looking up under the two cooling tower fans.Interior view looking up under the two cooling tower fans.

Want this article on your website? Click here to sign up for a free account in ContentStream® and make that happen.