Give each section of the entry points depending on how well the tactics were implemented, based on the information provided. If you think the question was not answered at all (in other words, avoided)βor if the building failed to include certain criteria of the ARC Awards, please give the section a ranking of β1 point.β Building systems (20 pts)
Rate the solutions to the challenges posed
Rate the buildingβs MEP design for innovation
Technology (16 pts)
Rate the use of new or unusual technologies
-
Building controls and automation
-
Electrical distribution
-
Fire protection
-
HVAC
-
Lighting controls
-
Motors and Drives
-
Plumbing
-
Software
Sustainability design and documentation (40 pts)
Rate the buildingβs energy efficiency
Rate the buildingβs IAQ system
Rate the buildingβs water conservation
Rate the buildingβs renewable energy(__/5 design)
Integration (10 pts)
What examples of interdisciplinary integration, for example, online collaboration, BIM, etc.,
Rate the level of control system integration for this projectβBAS, fire, communication, lighting, etc. Photography (18 pts)
Do the photos show the buildingβs exterior and interior?
Do the photos show:
-
Building controls and automation
-
Electrical distribution
-
Fire protection
-
HVAC
-
Lighting controls
-
Motors and Drives
-
Plumbing
Do the photos show specifically referenced engineered systems? Bonus (10 pts)
What is the repeatability factor of the solutions from this project? Total Building Systems points Total Technology points Total Sustainability points Total Integration points Total Photography points Total Bonus points Overall points