West Philadelphia High School
New construction: West Philadelphia High School; Brinjac Engineering
Project name: West Philadelphia High School
Location: Philadelphia, Pa.
Firm name: Brinjac Engineering
Project type, building type: New construction, school (K-12)
Project duration: 6.5 years
Project completion date: April 3, 2007
Project budget for mechanical, electrical, plumbing, fire protection engineering only: $15 million
Engineering challenges
There were two major engineering challenges. The first was finding a balance between the owner’s standards, maintenance requirements, and budget constraints against obtaining LEED certification. The second was the acoustical performance levels between the indoor equipment noise and the outdoor noise levels from the neighboring elevated train (El train).
Solutions
In both cases the design group was able to overcome the challenges and the project obtained U.S. Green Building Council LEED Gold certification.
Case Study Database
Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.