Water mist fire protection

Marioff Corp.'s HI-FOG water mist fire protection has received UL listing for use in ordinary hazard group 1 applications.

01/11/2012


Marioff Corp.’s HI-FOG water mist fire protection has received UL listing for use in ordinary hazard group 1 (OH1) applications. The UL listing, combined with the existing Factory Mutual (FM) light hazard (LH) system approval, makes HI-FOG the only water mist system approved by both organizations to protect commercial buildings, such as data centers, museums, offices, hospitals, high-rise buildings, and hotels. The HI-FOG system uses high pressure to force pure, potable water through sprinklers. The result is a mist of fine droplets with an increased surface area that absorbs heat efficiently through vaporization. The system controls and suppresses the fire by removing two of the main elements the fire needs to survive: heat and oxygen (reduced locally near the fire). The mist also rapidly cools the surrounding area, facilitating a safer escape for occupants.

www.hi-fog.com 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.