SEARCH Archives
Loading
Sponsored by:

Volume water heaters

Mighty Therm 2 boiler by Laars combined with 80-gal storage tank

03/20/2012


The Mighty Stack volume water heater by Laars combines the Mighty Therm 2 boiler with an 80-gal storage tank resulting in 199, 300, and 399 MBH sizes fueled by natural or propane gas. With less than 10 ppm NOx emissions, the sealed-combustion Mighty Stack offers 83% thermal efficiency and meets low lead requirements. This light commercial product is designed for apartments, restaurants, hotels, laundries, schools, and businesses. Key assets include its small footprint, a removable upper boiler section for easy handling, common venting, and up to 50 ft of Category I or III venting. Thanks to the rugged steel cabinet, the Mighty Stack can be installed inside or outside. Standard components include tank aquastat, pressure-relief valve, hot surface pilot ignition, and an integral induced-draft fan to allow for either horizontal or vertical venting.

Laars

www.laars.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.