Atlanta VA Medical Center. Courtesy: Sebesta BlombergEngineering firm: Sebesta Blomberg
2013 MEP Giants rank:
33
Project:
VISN 7 Medical Center Retro-commissioning Project
Address:
Various; Tuscaloosa, Ala.; Decatur, Ga.; Augusta, Ga.; Charleston, S.C.; Columbia, S.C.; Montgomery, Ala.; Birmingham, Ala.; Tuskegee, Ala.; Dublin, Ga.; United States
Building type:
Hospital
Project type:
Existing building retrofit
Engineering services:
Cx/Retro-Cx
Project timeline:
January 2010 to December 2013
Engineering services budget:
$3.13 million
MEP budget:
$3.13 million

Challenges

The challenge of the Retro-commissioning Program within VISN 7 (Southeast United States) was to improve energy efficiency, operations, and customer experience through improved environmental control of each facility. The project includes 10 VA campuses comprising of over 7.5 million sq ft of acute care, psychiatric care, and medical support facilities, generally constructed between 1930 and the first decade of the 2000s. The program was developed in response to the Energy Policy Act of 2005 and Executive Orders 13423 and 13514 that require an overall energy reduction of 30% by 2015 and a reduction in water use of 20% by 2015. The overall program objectives included training O&M staff, institutionalizing good operating practices, reducing operating costs, improving performance, extending building lifecycle, improving customer satisfaction, and providing safe and healthy buildings.

Solutions

Sebesta Blomberg began the retro-commissioning process with a thorough inspection and condition assessment of the energy and water consuming systems at each site. Based on the findings of the initial inspections, the firm identified components that required repair, replacement, or upgrades to allow it to reasonably evaluate the ability of the systems to satisfy the mission of the VA at an optimal energy profile. The project included funds to complete these items prior to follow-on system testing, system improvements, and staff training.

As part of the project, Sebesta Blomberg engaged the operating teams in the retro-commissioning process. Through their engagement, the firm was able to leverage their experience in operating these complex facilities, understand the unique operating demands of each facility, and begin a training process that was designed to build on the technical competencies at each individual site.

Once retro-commissioning testing was complete, the firm was assigned the task of implementing as many of the “quick-fix” and “deferred maintenance” items within the budget to achieve real savings at each VISN 7 campus.

In the end, the program resulted in a total reduction in energy use of 15% and a reduction of water consumption of 4%. The VA expended a total of $11 million on the retro-commissioning program that resulted in $3.5 million in energy and water savings. The overall program payback, all costs included, was 3 years.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
Cannon Design’s blog is a place for the many voices of the firm to share thoughts and news related to current projects...
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.