Viega, Fenwal and United Fire Protection Join Forces to Protect Lady Liberty

By Consulting Specifying Engineer Staff

07/08/2005


In 2003, the Statue of Liberty-Ellis Island Foundation, Inc. was asked by the U.S. National Park Service to raise funds necessary to make a number of critical improvements to the statue. The planned improvements included

On 9/11/2001, the National Park Service closed the Statue of Liberty National Monument due to direct terrorist’s threats.ass ceiling, guided by a park ranger, an enhanced lighting and new video system. 

The foundation engaged architects and engineers to provide a variety of design solutions, andUnited Fire Protection, N.J., was chosen as the contractor to install a new high-sensitivity smoke detection system.


The high sensitivity smoke detection (HSSD) application itself is inside the stairwell area of the statue, which is largely off-limits to the public now after increased security was established post 9/11.A demonstration system was shown to be effective in this area as part of the preliminary design portion of the project, witnessed by both the engineering firm and the National Park Service.

The HSSD system utilizing air-aspirating technology. The fundamental theory is to actively bring the smoke particulate matter to the detector—rather than passively waiting for the smoke to drift to the location of the detector. The system does this by a series of tubing networks with small holes, attached to a central detector unit with a fan, drawing the air from the monitored space, back through the tubing network, to the detector.

The detector utilizes a laser-based particle discrimination technology to determine both the number of particles and the size of the particulate in order to determine and discriminate between smoke levels and other contaminants like dust or pollen. The result is a magnitude more sensitive than standard spot detectors. Additionally, because the equipment uses the particle discrimination technique, no filtering is required and thus maintenance of the unit is minimal.

The result, says the contractor, was a project that finished ahead of schedule in July 2004.“We saved between 20% and 30% in labor costs at least,” said Joe Savino, United Fire Protection. “We have been using the system since 1999 and find it extremely efficient.”

The Statue of Liberty is more than a monument. She is a beloved friend, and a living symbol of freedom to millions around the world. The exhibits are a tribute to the people who created her, to those who built and paid for her, to the ideals she represents, and to the hopes she inspires. Viega, FenWal and United Fire Protection are partners who are proud to be a part of her history.

For more about Propress from Viega, click here . For information about HSSD from Fenwal, click here .





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.