SEARCH Archives
Loading
Sponsored by:

Video: The state of manufacturing, part 2

Interviews with industry leaders look ahead to manufacturing in a post-recession environment. Part 2 looks at pricing pressures and improving U.S. competitiveness.

04/12/2011

Flash is required!

Last February, CFE Media talked to a group of automation and manufacturing industry leaders at the ARC Advisory Group World Industry Forum. The discussions focused on changing conditions for manufacturers moving through 2011.

Companies included in Part 2:

• Cardinal Ethanol;
• Emerson Process Management;
• General Electric Intelligent Platforms;
• Invensys Operations Management;
• Mitsubishi Electric Automation;
• Reichhold Chemical;
• Rockwell Automation;
• Schneider Electric; and
• Yokogawa.

The questions are:

Prices have been generally stable in the recession in the U.S. What’s the global perspective on prices in the near term, and what are the pressures on price?

If the U.S. is going to rebuild its manufacturing leadership, what does it need to do today?

Bob Vavra hosts the discussion.

View Part 1 of the state of manufacturing video.

View Parts 1 and 2 of the state of manufacturing video in higher resolution.

Peter Welander, pwelander(at)cfemedia.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.