SEARCH Archives
Loading
Sponsored by:

Variable speed circulator

The HEC-2 Bumble Bee variable speed circulator by Taco uses ECM and permanent magnet motor technology.

12/07/2012


The HEC-2 Bumble Bee variable speed circulator by Taco uses ECM and permanent magnet motor technology. Courtesy: TacoTaco’s Bumble Bee high-efficiency variable speed circulator, the HEC-2, is a wet-rotor circulator using ECM and permanent magnet motor technology. It uses up to 85% less electricity than a standard circulator, and its out-of-the box settings and 360-deg swivel flange make it easy to install. Taco’s exclusive Delta-T technology boosts electrical savings by 15 to 19 times by making the entire system run more efficiently. With the ability to determine the exact flow required to match ever-changing building heat loads, the Bumble Bee can reduce boiler short cycling, increase total system efficiency, maximize energy savings, and improve consumer comfort. The Bumble Bee operates over a broad performance range, with flow up to 15 gpm and head up to 15 ft. The Bumble Bee is designed for many hydronic, radiant heat, boiler protection, fan coil, and snowmelt applications.

Taco

www.taco-hvac.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.