Using the basic design concepts employed at Harley-Davidson University (see page 28), an enhanced version was developed for the Alliant Energy World Headquarters located in Madison, Wisconsin. This 320,000-square-foot building currently under construction is a working model for the efficient energy-management policy of this utility company.

10/01/2000


Using the basic design concepts employed at Harley-Davidson University (see page 28), an enhanced version was developed for the Alliant Energy World Headquarters located in Madison, Wisconsin. This 320,000-square-foot building currently under construction is a working model for the efficient energy-management policy of this utility company.

The building utilizes state-of-the-art lighting systems, high-performance glass and enhanced thermal characteristics, which are the first major step in maximizing overall building performance. Both chilled- and hot-water systems utilize primary/secondary variable-speed pumping.

The chiller plant consists of water-side economizer cooling in conjunction with a 3,240-ton-hour ice-storage chiller system. The overall building design cooling load is 640 tons, which is met by first reducing the chilled-water temperature with the chillers and then further lowering the temperature via the ice system.

Because the chillers are used to build ice, constant-flow pumps are used for the primary side. Variable-speed pumps are used in conjunction with plate-and-frame heat exchangers for the secondary side of the system. In addition to this, variable-speed pumps are used for the condenser water.

Condenser-water flow is maintained by sensing the differential pressure across the condenser and automatic valve. The two-way automatic control valve is modulated in response to changes in chiller-refrigerant head pressure.

Control limits are set to maintain the minimum flow at or above three feet per second to prevent fouling. The design intent is to provide the coldest water possible to the condenser, and this is accomplished via an outdoor wet-bulb sensor that resets the temperature controller for the variable-speed tower fans. In addition, the chiller compressor speed is controlled by variable-frequency drives. Anticipated chiller full- and part-load performance as determined by computer simulation are shown in the above Table.

Simulated CHILLER PERFORMANCE


Percent LoadTons Refrigeration per ChillerkW per Ton


100


200


.590


75


150


.460


50


100


.390


25


50


.540





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me