Top 5 Consulting-Specifying Engineer Articles, January 16-January 22: the whole-system approach, NFPA 110-2016, batteries in mission critical facilities, more

Articles about the whole-system approach in design/construction, applying NFPA 110-2016, batteries in mission critical facilities, choosing a modular data center, and fire door inspections were Consulting-Specifying Engineer's five most clicked articles from last week, January 16-January 22. Were you out last week? You can catch up here.

01/23/2017


Consulting-Specifying Engineer's Top 5 most read articles online, for January 16-January 22, covered the whole-system approach in design/construction, applying NFPA 110-2016, batteries in mission critical facilities, choosing a modular data center, and fire door inspections. Link to each article below.

1. Why engineers should use a whole-system approach for design and construction

Using a whole-system approach to specifying equipment can lead to many benefits, such as improving the building's energy efficiency. 

2. How to apply NFPA 110-2016

Consulting engineers who specify emergency power equipment understand that installations for mission critical facilities, such as hospitals and data centers, are required to comply with NFPA 110: Standard for Emergency and Standby Power Systems in conjunction with NFPA 70: National Electrical Code. 

3. Design, maintain, test batteries in mission critical facilities

Engineering design, maintenance, and testing of batteries in mission critical facilities is imperative for proper operation and safety. 

4. How to choose a modular data center

Modular data centers can be cost-effective, scalable options. There are several variables to consider, however, when comparing them to brick-and-mortar facilities. 

5. Have you gotten close to your fire door lately?

The importance of initial fire door inspections and subsequent annual inspections cannot be overemphasized. The adoption and execution of initial and annual fire door inspections will result in safer conditions for building occupants. 


This list was developed using CFE Media's web analytics for stories viewed on www.csemag.com, January 16-January 22, for articles published within the last two months.

-Brana Webb, production coordinator, CFE Media, bwebb@cfemedia.com.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Emergency lighting; NFPA 3 and 4; Integrated building systems; Smart lighting, HVAC design
Designing for energy efficiency; Understanding and applying NFPA 101 for mission critical facilities; Integrating commissioning and testing for fire alarm systems; Optimizing unitary pumping solutions
Economics of HVAC systems; NFPA 110-2016; Designing and choosing modular data centers
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
click me