Timers and monitors get new housing for rugged applications

ABB has added a new housing for its time, measuring, and monitoring relays. The housing comes in double-chamber cage connection and push-in terminals for rugged applications.

02/04/2013


ABB has added a new housing for their time, measuring, and monitoring relays. The housing comes in double-chamber cage connection and push-in terminals for rugged applications. Courtesy: ABBThe ABB Low Voltage Products division has designed a new housing for its CT-S range of time relays and CM range of measuring and monitoring relays. The housing features two new innovative connection options, Double-Chamber Cage Connection terminals and Push-in terminals.

The Double-Cage Connection terminals utilize screw technology and can be connected with two wires of differing diameters up to 14 AWG, solid or stranded, with or without wire-end ferrules. The Push-in terminals feature spring clamp, Easy Connect technology, which allows the timers and monitors to be wired quickly and easily without any tools. With the Easy Connect option solid or stranded wires with ferrules can be connected without a tool, and stranded wires without ferrules can be connected by simply opening the cage with a screwdriver. The Push-in terminals are suitable for solid or stranded wires up to 20 - 16 AWG. The previously available ABB timer and monitor housing came only with a single cage clamp that required a tool for wire connection.

ABB

www.abb.com 



Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Boiler basics; 2017 Product of the Year winners; Manufacturing facilities Q&A; Building integration; Piping and pumping systems
2017 MEP Giants; Mergers and acquisitions report; ASHRAE 62.1; LEED v4 updates and tips; Understanding overcurrent protection
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
Power system design for high-performance buildings; mitigating arc flash hazards
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me