Three keys to successful energy recovery

Consider these energy recovery options for a nonresidential building.

08/29/2014


 

 

When evaluating energy recovery options for a facility, there are three key items to consider:

 

1. Understand the systems and internal processes of the existing facility or design intent. Take these processes to the model and develop a unique load profile for the facility.

2. Overlay the other HVAC systems in the load profile and find opportunities where energy can be shared. Also, review the processes to see what other forms of recoverable energy are available and try to pair them with the technologies that are available.

3. Understand the utility rate structure the customer is under so the return on investment embraces what the customer is paying for, as some of these technologies can help with peak shaving versus energy reduction. This can have more of a significant impact than just energy reduction, which is why the heating and cooling load profile is so important, both annually and on a 24-hour/day basis.


Daniel Cohen is a senior associate and mechanical engineer with Environmental Systems Design. He specializes in high-efficiency buildings, central plants, and analysis and building modeling. Jay F. Ramirez is a senior vice president and the practice leader for the health, science, and education market sectors at Environmental Systems Design with 28 years of experience in high-tech facilities including R&D, laboratory, manufacturing, and healthcare. 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me