The IPD model

  • Early involvement of key participants
  • Rapid prototyping of design options utilizing BIM as a platform
  • Shared risk and reward
  • Collaborative decision-making and control
  • Jointly developed and validated project goals
  • Implementation of principles of Lean construction including target value design.

The team leaders need to understand and buy into the fact that all of the above elements are necessary for project success.

Integration

  • Sharing knowledge, not just information
  • Leveraging each other’s capacities and skills
  • Helping every team member do their best
  • Learning and improving together, not just individually.

The integrated team/organization

  • People with leadership, vision, and mutual trust work together as a team, sharing good and bad news openly and honestly
  • Intentionally designing an effective project delivery organization
  • Lean thinking and practices that leverage BIM to build virtually and make off-site fabrication and reliable on-site workflow possible.

Team members must see themselves as partners who either win or lose together, and not as individual companies.


Raj Daswani is a principal at Arup, Jack Poindexter is a project executive at DPR Construction, and Dean Reed is director for Lean construction at DPR Construction.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me