Thorson • Baker and Assocs. Inc.: Flats East Bank Building #4

New construction at an engineered multi-dwelling/retail complex/restaurant and a parking garage/service station.

08/14/2014


Flats East Bank Building #4, under construction. Courtesy: Thorson • Baker & Assocs. Inc.Engineering firm: Thorson • Baker & Assocs. Inc.
2014 MEP Giants rank: 85
Project: Flats East Bank Building #4
Address: Cleveland, Ohio, U.S.
Building type: Engineered multi-dwelling/retail complex/restaurant, Parking garage/service station
Project type: New construction
Engineering services: Automation/controls, electrical/power, fire/life safety, HVAC/mechanical, lighting, energy/sustainability, and plumbing/piping
Project timeline: 12/2013 to 7/2015
MEP/FP budget: $374,000

Flats East Bank Building #4, under construction. Courtesy: Thorson • Baker & Assocs. Inc.Challenges

Thorson • Baker & Associates, Inc. (TBA) is excited to be a part of completing the goals and desires of The Wolstein Group, and Fairmount Properties. This eight-story, 510,449-sq-ft mixed-use apartment building consists of commercial tenants (mostly restaurants) on the first floor, 243 apartments on floors three through eight, and two floors of indoor parking. The new construction includes 59,100 sq ft of retail tenant space, 101,500 sq ft of parking spaces/service area, and 321,249 sq ft for apartments. The most complex challenge of this project was to design a space that maximizes the building’s floor space. Due to the restaurants on the first floor, it was a challenge to get the kitchen exhaust to the roof.

Solutions

Flats East Bank Building #4, under construction. Courtesy: Thorson • Baker & Assocs. Inc.Instead of having 14 to 28 different exhaust shafts to the roof, the firm designed a six-stack system to accommodate the restaurant’s requirement of providing exhaust for possibly 14 restaurants. The building was designed using a water source heat pump system using condensing boilers and cooling tower to limit the size of penetrations through the floor. This project is seeking Enterprise Green Communities certification with the City of Cleveland.

 

 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me