Tear down the walls, literally

Walls in work areas can hurt direct and indirect communications for dynamic, fast-paced teams and projects. Without a wall, lift your head, get an answer, and return to work.

05/14/2013


We got rid of cubicle walls around the same time we started moving people constantly according to their teams and projects. We didn’t do this for the whole office, but we realized that for our teams that work in a dynamic, fast paced environment, walls were hurting direct and indirect communications.

Direct communications

Lift you head up, see who’s out there to help, ask your question, get your answer, and go back to work. There is no need to get up and wander around if there are no walls. This may provide lots of short distractions but if you really need to focus, you can put on your headphones or ear plugs as a visual “do not disturb” sign.

Quick impromptu meetings are easier for the same reason. It’s as simple as “Hey, come here, see this?” or “What are you up to? I don’t think that’s the right direction.” We don’t have to wait until tomorrow to find out time has been wasted.

Indirect communications

If you’re the project manager or team lead, and there is a delay in those familiar typing and clicking noises, your spider senses start to tingle. It’s easy to ask – “Hey are you stuck?”

People venting and getting frustrated is always visible. If someone’s stuck, anyone on the team can see this and help. A face that is frustrated or unsure can’t be hidden without walls. “Stuck” time is lower and people are back to work before you know it.

Sure there is more noise and sometimes you need to move to a different area for a client call or to focus on a task, but walls impede a healthy team environment – tear them down.

- The Control Engineering “Automation System Integration” blog is written by Anthony Baker, a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration. The blog provides Callisto Integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. Andrew Barker, P.Eng., Callisto Integration, compiled the advice. See additional posts at www.controleng.com/blogs.

www.callistointegration.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.