Supervisors, managers: Win the war, not the battle

Be sure you know the ultimate goal.

01/23/2014


In the frenetic pace of life, it’s easy to fall into the trap of resolving an issue, moving on to the next crisis, resolving that, moving on, etc. Some liken it to a game of “Whac-A-Mole.” When you’re in a supervisory or management position, the need to decrease your reactive time and increase your proactive time is critical. How can you do that to keep your group focused? 

One example that comes to mind is when we were implementing flow manufacturing and asking for active participation from those on the factory floor—not always a part of the factory culture. From a management standpoint, we had asked that those doing the work play a key role in designing the flow. Managing that created challenges for all involved. One of the floor supervisors brought up a tough issue: He was convinced that the correct spot for a particular table in assembly was in a certain position, but the group of people who worked in that area didn’t agree. He was frustrated, thinking he should just tell them to move it where he wanted and get on with it. Fortunately, he decided to talk it over with the group before taking that action. 

What would you do? Here’s something to consider: The amount of time you spend directly interacting with those in your charge is usually very small. After all, 1% of the 2,000 hours in a work year is 20 hours. So you may spend a few percent of the year, at best, with each person—not much time. Therefore, in the time you do have, reinforcing how you want things done, not just how to do one particular thing, is more important. Think: “Win the war, not the battle.” If you’re trying to encourage team members to think for themselves and progressively problem solve to come up with the right answer without your involvement, don’t cut off the right type of thinking too soon by being a dictator and forcing an answer. 

Obviously you need to step in if things aren’t happening, and when that’s the case it’s a judgment call on your part. But if the group is making decisions appropriately, at a good pace, and moving in the right direction, let them. Premature intervention could be a very costly move, as you stand a chance of losing their hearts and minds. They’ll forever conclude that you really didn’t mean it, that you’d just read a management book and that fad will pass. They’ll respond by cutting off the flow of ideas, and as a result the group will lose by missing opportunities to improve. Additionally, you will have taken a serious blow to your credibility, perhaps the biggest loss to your leadership role. 

In my example above regarding placement of the table in the assembly, I gave the floor supervisor the additional suggestion that if he was right, the workers would keep evolving to put that table where he thought was best. They’d eventually get to that point—by themselves. Allowing that to happen opened up opportunities for the team to do other things that they didn’t even know needed to be done, which was the point of making this culture change. And if they were right—and the floor supervisor was not—he’d learn something too. 

So, make sure you know what your ultimate goal is, then keep it in mind as your group moves ahead. Reinforce the behavior that is in line with that goal and correct the behavior that is not. Don’t win the battle but lose the war—instead, know the war you are trying to win, and give up battles as needed.


John Suzukida was Trane’s senior VP of global marketing and strategy prior to founding Lanex Consulting in 2002, which focuses on strategic planning and product-to-solutions business model transitions. He has a BSME and distinguished alumnus award from the University of Illinois at Urbana-Champaign. 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.