Steel Plant Controls Power Demand

Steel-bar producer Republic Technologies International recovered the installed cost of a demand management system in a Canton, Ohio, facility in under 6 months and projects ongoing cost savings up to $70,000 monthly.Electric power costs of $2.7 million per month are a significant share of operating expenses.

03/01/2001


Steel-bar producer Republic Technologies International recovered the installed cost of a demand management system in a Canton, Ohio, facility in under 6 months and projects ongoing cost savings up to $70,000 monthly.

Electric power costs of $2.7 million per month are a significant share of operating expenses. The contract with its electric power provider includes a demand limit, above which the price of power significantly rises. A curtailment clause gives the utility the option to mandate immediate reduction of load to base levels.

The solution was to inhibit or shed electric furnace loads to control power demand. The specified system totals electric meter pulses and projects demand within the 30-minute fixed-demand interval. Furnace operators select priorities to determine the system's actions based on the demand forecast.

The new system utilizes a redundant pair of processors with backup communications modules tied into the existing control Ethernet. Remote I/O panels at the three furnaces use a redundant fiber-optic loop to communicate with the processors. In addition, a new power monitoring system on the plant mains provides additional power-quality data.

For more information on power monitoring and control systems from Rockwell Automation, circle 453 on the Reader Service Card.

From Pure Power, Spring 2001





No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
40 Under 40; Performance-based design; Clean agent fire suppression; NFPA 92; Future of commissioning; Successful project management principles
BIM coordination; MEP projects; NFPA 13; Data center Q&A; Networked lighting controls; 2017 Product of the Year finalists
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me