Specifying pipe and piping materials

Piping is used within many building systems, including HVAC, plumbing, specialty chemicals and fluids, and fire protection. Knowing what type of piping to use in a specific application can help preserve the life of a system or avoid a catastrophic failure.

02/01/2013


Learning Objectives 

1. Understand the challenges of low- and high-rise piping systems.

2. Learn about three piping system types: HVAC (hydronic piping), plumbing (domestic water, and waste and vent piping), and specialty piping for chemicals and fluids (saltwater systems and hazardous chemicals).


Chilled water piping is connected to the main pumps within this central plant. Courtesy: JBA Consulting EngineersPipe and piping systems are found within many elements of buildings. Numerous people have seen a P-trap below a sink or refrigerant lines routing to and from their residential split system. Fewer have seen the main utility piping routing from a central plant or the chemical treatment systems within a pool equipment room. Each of these applications requires a specific type of pipe to meet the requirements of the codes, physical limitations, specifications, and best design practices.

There is no simple piping solution to meet all applications. Provided that specific design criteria are followed and the right questions are asked of the owner and operational staff, these systems can meet all of the physical and code requirements. In addition, they can maintain the proper cost and lead times to create a successfully implemented building system.

HVAC piping

HVAC piping encompasses many different fluids, pressures, and temperatures. This piping can be located above or below ground and route through the interior or exterior of a building. These factors must be taken into consideration when specifying HVAC piping within a project. The term “hydronic” refers to the use of water as a heat transfer medium for cooling and heating. In each application, the water is supplied at a set flow rate and temperature. Typical space heat transfer is completed using an air-water coil designed to return the water at a defined temperature. This results in a specified quantity of heat delivered or removed from the space. Hydronic chilled and heating water are the dominant systems used to condition large commercial facilities.

This shows plate and frame heat exchangers connected with chilled and condenser water piping within a central plant. This assembly is used to provide waterside economizer during certain times of the year.Courtesy: JBA Consulting EngineersFor most low-rise building applications, the expected system working pressure is typically less than 150 pounds per square inch gauge (psig). Hydronic systems (both chilled and heating water) are closed-loop systems. This means that the total dynamic head of the pumps takes into account the friction losses within the piping system, associated coils, valves, and accessories. The static height of the system does not affect the pumping capacities, but it does affect the required working pressure of the system. A 150 psig working pressure rating for chillers, boilers, pumps, piping, and accessories is common for equipment and component manufacturers.This pressure rating should be maintained within system designs whenever possible. Many buildings that are considered as low- or medium-rise will fall into the 150 psig working pressure category.

Maintaining the piping system and equipment below the standard pressure of 150 psig becomes more difficult when designing high-rise buildings. A static piping height above approximately 350 ft (with no pump pressure added to the system) will exceed the standard working pressure rating for these systems (1 psig = 2.31 ft of head). This system would most likely employ a pressure break (in the form of heat exchangers) to isolate the higher pressure requirements of the tower from the rest of the connected piping and equipment. This system design would allow standard pressure chillers to be designed and installed, while specifying higher pressure piping and accessories within the tower component.

When specifying piping for a large campus project, designers/engineers must be intentional when editing the associated specifications sections (ARCOM MasterSpec sections 23 21 13.23 and 23 21 13.13, respectively, for above- and below-grade hydronic piping) to be certain that the piping specified for the tower and podium are reflective of their individual requirements (or collective requirements if heat exchangers are not used to isolate the pressure zones).

Another component of the closed-loop systems is water treatment and purging of any oxygen from the water. Most hydronic systems are fitted with water treatment systems composed of various chemicals and inhibitors to maintain the water flowing through the pipes at optimal pH (approximately 9.0) and microbiological levels to resist bio-film buildup and corrosion within the piping. Stabilizing water within the system and removing any air helps provide the full life expectancy of the piping, associated pumps, coils, and valves. Any air left within the piping can cause cavitation at the chilled and heating water pumps and reduce heat transfer within chillers, boilers, or hydronic coils.


<< First < Previous 1 2 3 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.