SEARCH Archives
Loading
Sponsored by:

Self-adjusting pre-fab ring

This Rapid Ring self-adjusting pre-fab ring designed by Cooper B-Line allows for tool-free installation in as little as 15 secs, available for 1- to 4-gang SKUs.

04/13/2012


Rapid RingThis Rapid Ring self-adjusting pre-fab ring designed by Cooper B-Line allows for tool-free installation in as little as 15 secs, available for 1- to 4-gang SKUs. Installation of the system includes four steps: removing the protective plate, connecting the wiring device, positioning the device assembly, and then pushing it into place. Manufactured in the United States by union-made assemblies, the pre-fab ring is self-adjusting to fit finished wall depths of 0.5 to 2 in. and various types of tile. It features a quick-release protective plate with a raised surface for routing, and it fits most standard boxes and brackets.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

What percentage of your time is spent commissioning building projects?
0% to 25%
26% to 50%
51% to 75%
75% to 100%


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.