Saving money in hospital electrical distribution systems

10/06/2013


Saving money with co-generative demand-side management

In the past, a hospital (typically equipped with a Level 1 generator) was a perfect candidate for peak shaving agreements with a utility. However, this has become more challenging within the last two years with the advent of the EPA’s Tier IV requirements for the generators used in this application. The premium for upgrading or ordering a generator to meet Tier IV requirements is typically not cost effective in the areas of the U.S. where electricity is relatively inexpensive. 

However, the abundance of natural gas provides a new opportunity for many existing hospitals that need more emergency power and want to shave utility demand charges and/or enter into a formal peak shaving agreement with the utility. Natural-gas-fired turbines provide U.S. Environmental Protection Agency-compliant emergency power solutions. The start time for a turbine precludes it from being a life safety generator. However, this technology has the potential to be a triple-bottom-line winner by providing:

  • Peak shaving and/or demand-side management of the electrical load
  • Optional standby power for systems that the hospital needs to run in a prolonged outage
  • Co-generative heat that can be harvested for hot water systems within the hospital. 

 

The utility bills and the facility agreement is really the starting point for determining whether this money saving option is viable. Several factors must be present for this to be a successful design:

  • Access to natural gas infrastructure
  • A significant portion of the electrical bill must be due to a demand charge. This dollar amount is what adding a turbine can significantly reduce.
  • The size of the turbine must consider the minimum base electric load present at the facility. The efficiencies of the turbine will not be present if it isn’t kept at full capacity.
  • Any type of utility demand-side-management program with the utility that can defray the energy rates. 

The initial investment for a high-efficiency natural gas turbine can be daunting (initial cost is usually in excess of $2M). But evaluating the return on your client’s investment based on the offset utility costs and co-generative advantages will typically produce positive cash flow within 3 to 4 years and payoff within 7 years. This is considered a long-term investment and not attractive to some clients. However, give your clients the evaluation and let them decide how to spend their money. We are trusted engineering advisors, not accountants. The clients’ CFO may have a very different perspective on the proper use of their money.

Both of these approaches have been personally successful for me. I hope that you too can employ some of the same strategies in your next energy-saving strategy sessions with your clients.


Versluys is a senior electrical engineer and principal at TLC Engineering for Architecture. His areas of expertise include sustainable health care design and campus distribution systems. He is a member of Consulting-Specifying Engineer's editorial advisory board.


<< First < Previous 1 2 Next > Last >>

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating electrical and HVAC for energy efficiency; Mixed-use buildings; ASHRAE 90.4; Wireless fire alarms assessment and challenges
integrated building networks, NFPA 99, recover waste heat, chilled water systems, Internet of Things, BAS controls
40 Under 40; Performance-based design; Clean agent fire suppression; NFPA 92; Future of commissioning; Successful project management principles
Transformers; Electrical system design; Selecting and sizing transformers; Grounded and ungrounded system design, Paralleling generator systems
Commissioning electrical systems; Designing emergency and standby generator systems; VFDs in high-performance buildings
Tying a microgrid to the smart grid; Paralleling generator systems; Previewing NEC 2017 changes
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Fire & Life Safety Engineer; Technip USA Inc.
This course focuses on climate analysis, appropriateness of cooling system selection, and combining cooling systems.
This course will help identify and reveal electrical hazards and identify the solutions to implementing and maintaining a safe work environment.
This course explains how maintaining power and communication systems through emergency power-generation systems is critical.
click me