SEARCH Archives
Loading
Sponsored by:

RTKL grows mission critical team

RTKL has made two additions to its growing mission critical team: Rajan Battish and Shan-té Johnson.

11/30/2010


Global architecture, engineering and urban design practice RTKL has made two additions to its growing mission critical team: Rajan Battish PE, LEED AP, and Shan-té Johnson, who bring a wealth of industry experience to their roles.

Battish, who rejoins RTKL as a principal charged with leading the studio’s design and engineering capabilities, offers more than 15 years of experience in electrical design with a specialization in power infrastructure for mission critical and 7x24 facilities. He rejoins RTKL from BKM, where he served as the managing principal of BKM Mission Critical Facilities. Prior to BKM, he spent over a decade at RTKL, where he led engineering design on several of the firm’s most notable data center projects, including the Highmark Enterprise Data Center, eBay Enterprise Data Center, and the data center that serves Johns Hopkins University and Hospital.

Johnson, who has more than a decade of engineering, marketing and business development experience, joins the studio as business development manager for mission critical and engineering projects. Prior to joining RTKL, she served as the business development manager for MACTEC, a national environmental, construction services and facilities engineering firm. She also held an account development position at ARCADIS, an international environmental engineering firm, where she oversaw market research and managed the proposal process for a number of the company’s Fortune 500 clientele.

RTKL’s mission critical team offers a variety of capabilities ranging from MEP and structural engineering to architecture and commissioning. As early innovators in sustainable data center design, RTKL patented the ‘Tower of Cool’ technology and later designed Highmark, the first data center to receive both LEED Silver certification from the US Green Building Council and Tier-III certification from the Uptime Institute. Highmark remains the only data center in the country that holds this distinction. The firm also oversaw the full range of design services for eBay’s recently completed 60,000-SF, Tier IV data center in Salt Lake City, Utah, and 3000 Skyline, a 700,000-SF co-location facility in Mesquite, Texas.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
40 under 40
Integrating lighting, HVAC systems; Use building energy modeling software to balance lighting and HVAC systems
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.