Robotics help manufacturing operations: a robotic cell for the blind

Pre-Tec offers customizable robotics solutions, including a robotic work cell for blind operators.

03/11/2011


Pre-Tec offers robotic products and services.Lighthouse for the Blind Inc. in Seattle uses a Robotic Finishing cell built by Pre-Tec, a division of Willamette Valley Company. The finishing cell supports production of Lighthouse’s E-Tool or Entrenching tool, a collapsible shovel used by members of the U.S. military as well as Relief Agencies. The components of the E-Tool are manufactured on a variety of equipment including the new robotic cell. By using adaptive technology with audio as well as enhanced visual monitors, Lighthouse helps blind operators to safely operate the robotic cell. Pre-Tec said the E-Tool program has created more than 15 jobs for a community of people with a 70% unemployment rate.

 

Pre-Tec offers http://www.pre-tec.comautomated solutions for accurate and efficient production, including products and services, with ability to custom-design advanced robotic systems and manufacturing cells for products ranging from micro circuit boards to trenching tools for the military.

Products and systems provide manufacturing and assembly techniques that meet and exceed goals for speed, accuracy, flexibility, and optimal throughput in all types of manufacturing and assembly environments. Projects include multi-axis robot arms, custom built end-of-arm tooling, conveyance systems and others.

Custom Robotics

PRE-TEC designs and builds turn-key solutions using multi-axis robot arms, custom end-of-arm tooling, conveyance systems, and safety hardware incorporating:

  • Multi-axis Configurations
  • Programmable Force Control Applications
  • End-of-Arm Tooling and Fixturing
  • ANSI- and OSHA-Compliant Safety Enclosures utilizing State-of-the-Art Sensor Technologies
  • Project Documentation
  • PC-Based Software
  • Process / Product Tracking
  • Training and Start-up Assistance
  • Maintenance and Service Programs

Pre-engineered Cells

PRE-TEC has developed pre-engineered cells for various manufacturing and finishing processes, including:

  • Welding Cells
  • Material Finishing Cells for grinding, polishing or sanding
  • Machine Tending Cells

Rufus Burton, Sales Manager for PRE-TEC, said a recently redesigned site incorporates a "Rapid Response mechanism so that visitors can pose a specific, detailed question and receive, within 24 hours and via phone, fax, or e-mail, a personal response from an engineer trained specifically in the appropriate discipline. Our Rapid Response Team is representative of our ability and commitment to responding to customers’ needs as quickly as is needed.”

www.pre-tec.com

Pre-Tec

- Edited by Gust Gianos and Mark T. Hoske, Control Engineering, www.controleng.com



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Smoke control: Designing for proper ventilation; Smart Grid Standard 201P; Commissioning HVAC systems; Boilers and boiler systems
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
Cannon Design’s blog is a place for the many voices of the firm to share thoughts and news related to current projects...
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.