SEARCH Archives
Loading
Sponsored by:

Raytheon opens missile plant in Alabama

New Huntsville facility features laser-guided robotic transport to workstations.

11/28/2012


Raytheon Company has opened its new all-up-round Standard Missile production facility in Huntsville, Ala. At the cutting-edge factory, workers will complete final assembly and testing of the company's Standard Missile-3 and SM-6 interceptors. Courtesy: RaRaytheon Company has opened its new all-up-round Standard Missile production facility in Huntsville, Ala. At the cutting-edge factory, workers will complete final assembly and testing of the company's Standard Missile-3 and SM-6 interceptors.

Raytheon executives from around the country joined government customers and elected leaders at a ribbon-cutting ceremony to mark the opening of the new 75,000 square-foot facility located on the U.S. Army's Redstone Arsenal.

The new plant features a fleet of laser-guided transport vehicles that silently move missiles around the factory. The robotic, automatic guided vehicles carry up to five tons and use lasers and software to position missiles within 1/10,000th of an inch. The laser-guided vehicles handle all hardware transfers necessary, allowing technicians to concentrate on other aspects of production. Powered by a lithium battery, the transporters use their own internal positioning system for safely and efficiently maneuvering through the facility to the workstations.

William H. Swanson, Raytheon Chairman and CEO, cut the ribbon at the plant on Nov. 26. He was joined by Vice Admiral James D. Syring, director of the Missile Defense Agency; U.S. Rep. Mo Brooks; Sen. Richard Shelby; Dr. Taylor Lawrence, Raytheon Missile Systems President; and Alabama Lt. Gov. Kay Ivey.

"This factory is the most advanced missile integration facility in the world, enabling Raytheon to provide our domestic and international customers with the most effective, reliable and affordable products possible," said Lawrence. "The missiles assembled in this factory will play a critical role in protecting our homeland and defending our allies around the globe."

“This integration center, its employees and the innovative products we build here will indeed be national assets,” Lawrence added. “We recognize that countless lives may one day depend on these technologies.”

"This missile integration facility will create new jobs for Alabama's workers to help bolster our nation's defense," said Shelby. "The facility will further enhance Huntsville's indispensable role in our nation's security and the region's economy."

The first SM-6 missiles are scheduled to be delivered from the new facility to the customer in February 2013; initial SM-3 rounds are scheduled to be delivered the following quarter.



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Integrating lighting, HVAC systems, Energy codes and lighting, BIM and fire protection engineering
Engineering hospital electrical systems, Boilers and boiler systems, Building envelope best practices
Hospital indoor air quality, ASHRAE 90.1 update, Specifying piping materials, Integrated project delivery
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Estimating data center PUE, Design tips for cost savings, Networked controls, NFPA 70E
Preventing arc flash, Backup power fuel choices, power for high-tech facilities
Using BIM in electrical power design; Closed-transition transfer; Medium-voltage distribution; Diesel emission regulations; Increasing emergency power capacity

Poll of the Week

When engineering systems in military buildings, what’s the most difficult issue you face?
Automation and controls
Codes and standards
Electrical and power
Energy efficiency, sustainability
Fire and life safety
HVAC


Click Here for Poll Archives
Sponsored by:

About Us | Contact Us | Advertise | Subscribe to Magazine | Site Map | Privacy Policy
Home | Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.