Newly installed MEP systems at the Waterbury Career Academy aim at generating significant energy savings as the energy model was designed to exceed ASHRAE 90.1-2007 by 63.4%.

11/04/2014


Waterbury Career Academy High School. Courtesy: Consulting Engineering Services Inc.Project name: Waterbury Career Academy High School

Project type: New construction

Engineering Firm: Consulting Engineering Services Inc.

Building type: Educational facilities

Location: Waterbury, CT

Timeline: 2010 - August 2013



Building details

The Waterbury Career Academy, an intra-district high school, was a new construction project consisting of 150,000 sq ft. It focuses on teaching science, technology, engineering and math, also known as STEM skills. Engineering Technology features a manufacturing shop, engineering lab, CAD I/II lab; Computer Systems has a Cisco shop, electronic engineering lab, instructional computer lab; Human Services contains a Health and Safety lab, human services classroom, preschool classroom; and, Health Services is supported with a medical skills lab, physical therapy lab, simulated clinic with nurse's station, and exam room. The primary design challenge was to fit the square footage required and the equivalent area of a football field on a very steep site, while preserving existing wetlands and other natural features.

Cafeteria within school. courtesy: Consulting Engineering Services Inc.Project details

The project team provided mechanical, electrical, plumbing as well as fire protection engineering design services, utilizing AutoDesk Revit MEP 2010 for the new construction of the Waterbury Career Academy. The project team also provided building modeling services. The HVAC systems include 150 geothermal bores to cover the buildings heating and cooling load. Water to water heat pumps located in the ground floor mechanical room convert the geothermal ground source water into building heating and cooling water. The majority of the building is ventilated, air conditioned and heated utilizing an active chilled beam system connected to a dedicated outside air system.

The dedicated outdoor air system provides 100% dry, tempered outside air to the chilled beams. This unit contains a desiccant wheel and a total energy recovery wheel, chilled water coil and hot water coil to dehumidify and reheat the outside air efficiently. The kitchen, cafeteria and gym are served by an air handling unit with chilled water coils and hot water coils. Separate zones are provided by VAV boxes with hot water reheat coils and radiant floor heating was provided in the cafeteria for first stage of heating. Locker rooms have a heat recovery ventilator to reclaim energy and all other restrooms are exhausted through the dedicated outdoor air units to reclaim energy.

Electrically, the highlights include a 50kW rooftop photovoltaic system located on the gymnasium roof which will provide $15,000 per year in energy savings. Pendent lighting fixtures are provided throughout the building with daylight dimming controls. There are two levels of lighting controls provided in each classroom and the offices. A generator will support emergency lighting, freeze protection, fire alarm system and the fire pump. The school was designed in accordance with Connecticut's High Performance Building standards and is LEED Gold equivalent.

Front entrance to school. Courtesy: Consulting Engineering Services Inc.Project results

The Waterbury Career Academy has been fully functioning for less than one year. The systems included will produce a significant energy savings as the energy model concluded that this new school was designed to exceed ASHRAE 90.1-2007 by 63.4%. Project engineers used various high energy efficient systems such as low flow fixtures in the bathrooms that consume 20% less water in aggregate as compare to base levels calculated by meeting the Federal Energy Policy Act of 1992 fixture performance requirements. They also contribute to the 30% reduction of total potable water usage. The installation of on-site renewable energy micro-inverters will provide at least 3% of the building's energy needs while also providing $15,000 per year in energy savings. This is based upon the US Department of Energy Commercial Buildings Energy Consumption Survey for estimated electricity usage. Each classroom is equipped with one row of dimming 0-10V lights on a daylight sensor to conserve energy as well as a second row of full linearly dimmed lights. In addition the indoor light measurements confirmed that both typical classrooms and office receive an average luminance above 25 footcandles. It is also predicted that the HVAC systems will provide approximately $475,000 per year in energy savings. 



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Combined heat and power; Assessing replacement of electrical systems; Energy codes and lighting; Salary Survey; Fan efficiency
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me