Project name: Henkels & McCoy Headquarters Emergency Generator

Project type: Addition to existing building

Engineering Firm: Henkels & McCoy

Building type: Office building

Location: Blue Bell, PA, United States

Timeline: November 2012 - October 2013


Previous 5kV Main Switchgear, manufactured in 1974. All images courtesy of Henkels & McCoy.

Project goals

  • Provide a reliable, low-cost backup generator solution to power the Jolly Road facility during loss-of-utility events.
  • Provide H&M with additional revenue from PJM “Demand Response Program”. This includes being able to take H&M off-grid while the utility is still operating, using closed-transition switching.

Building details

There are two buildings on this property. One building contains 6,000 sq ft of automotive maintenance area, 14,000 sq ft of warehouse storage, and another 9,000 SF of office space. The other building contains about 46,000 sq ft of office space, plus a cafeteria and a large data center and copy center.

Project details

Engineering, Construction, and the Henkels & McCoy Maintenance Department designed and installed a 4kV, 750kW generator. Engineering and all concerned Newly completed substation yard and generator.worked with vendors to provide the most cost effective approach to this purchase and implementation. The generator was fed directly into a G&W Automatic Transfer Control Switchgear, which replaced the existing 35 year old switch. Requirements for participation in Demand Response Programs were evaluated; it was determined to be less important than providing effective, economic backup power.

Project success

The project's success was clearly demonstrated during the recent power outages in the area from an ice storm. When the area lost power, the entire Henkels & McCoy facility was able to stay powered up and respond with line crews and other personnel and equipment. In addition, the other employees could perform their work, reducing the amount of downtime and expenses related to sending employees home.


Henkels & McCoy, 985 Jolly Road, Blue Bell, PA 19422



No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Water use efficiency: Diminishing water quality, escalating costs; Lowering building energy use; Power for fire pumps
Building envelope and integration; Manufacturing industrial Q&A; NFPA 99; Testing fire systems
Labs and research facilities: Q&A with the experts; Water heating systems; Smart building integration; 40 Under 40 winners
Maintaining low data center PUE; Using eco mode in UPS systems; Commissioning electrical and power systems; Exploring dc power distribution alternatives
Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.