Project name: Henkels & McCoy Headquarters Emergency Generator

Project type: Addition to existing building

Engineering Firm: Henkels & McCoy

Building type: Office building

Location: Blue Bell, PA, United States

Timeline: November 2012 - October 2013

Previous 5kV Main Switchgear, manufactured in 1974. All images courtesy of Henkels & McCoy.

Project goals

  • Provide a reliable, low-cost backup generator solution to power the Jolly Road facility during loss-of-utility events.
  • Provide H&M with additional revenue from PJM “Demand Response Program”. This includes being able to take H&M off-grid while the utility is still operating, using closed-transition switching.

Building details

There are two buildings on this property. One building contains 6,000 sq ft of automotive maintenance area, 14,000 sq ft of warehouse storage, and another 9,000 SF of office space. The other building contains about 46,000 sq ft of office space, plus a cafeteria and a large data center and copy center.

Project details

Engineering, Construction, and the Henkels & McCoy Maintenance Department designed and installed a 4kV, 750kW generator. Engineering and all concerned Newly completed substation yard and generator.worked with vendors to provide the most cost effective approach to this purchase and implementation. The generator was fed directly into a G&W Automatic Transfer Control Switchgear, which replaced the existing 35 year old switch. Requirements for participation in Demand Response Programs were evaluated; it was determined to be less important than providing effective, economic backup power.

Project success

The project's success was clearly demonstrated during the recent power outages in the area from an ice storm. When the area lost power, the entire Henkels & McCoy facility was able to stay powered up and respond with line crews and other personnel and equipment. In addition, the other employees could perform their work, reducing the amount of downtime and expenses related to sending employees home.

Henkels & McCoy, 985 Jolly Road, Blue Bell, PA 19422

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
HVAC and building envelope: Efficient, effective systems; Designing fire sprinkler systems; Wireless controls in buildings; 2015 Product of the Year winners
2015 MEP Giants: MEP Giants annual report; Mergers and acquisitions; NFPA 2001; Fiber-optic cables; LED specifications
Hospital IAQ: Indoor air quality in health care facilities; NFPA 72; Water use and conservation; Net-zero buildings
Designing positive-energy buildings; Ensuring power quality; Complying with NFPA 110; Minimizing arc flash hazards
Implementing microgrids: Controlling campus power generation; Understanding cogeneration systems; Evaluating UPS system efficiency; Driving data center PUE, efficiency
Optimizing genset sizing; How the Internet of Things affects the data center; Increasing transformer efficiency; Standby vs. emergency power in mission critical facilities
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.