Project profile: Headquarters electrical improvement

System upgrades for a 16-story office building will help reduce electrical costs.


Project name: Chrysler Mexico headquarters, office electrical improvement

Project type: System overhaul (mechanical, fire protection systems upgrade)

Engineering Firm: A&R Contruccion Sustentable y Mantenimiento

Building type: Data center/office building

Location: Cuauhtemoc, Mexico

Timeline: May 2014 – December 2014

Project details
This project is a system upgrade for a 16-story building with 7 parking areas, data centers, waste water treatment plant, and green areas. Phase one upgrade includes major electrical substations improvement, indoor and outdoor lighting fixtures, and LED technology installation. Studies on electrical sustainability are conducted for future Leadership in Energy and Environmental Design (LEED) certification. Phase two of the project will be focusing on HVAC and civil engineering improvement.

Project goal
The overall goal of the project is to reduce electrical cost by 30%.

No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
Commissioning lighting control systems; 2016 Commissioning Giants; Design high-efficiency hot water systems for hospitals; Evaluating condensation and condensate
Solving HVAC challenges; Thermal comfort criteria; Liquid-immersion cooling; Specifying VRF systems; 2016 Product of the Year winners
MEP Giants; MEP Annual Report; Mergers and acquisitions; Passive, active fire protection; LED retrofits; HVAC energy efficiency
Driving motor efficiency; Preventing Arc Flash in mission critical facilities; Integrating alternative power and existing electrical systems
Putting COPS into context; Designing medium-voltage electrical systems; Planning and designing resilient, efficient data centers; The nine steps of designing generator fuel systems
Designing generator systems; Using online commissioning tools; Selective coordination best practices
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.
click me