Power Distribution Units

09/16/2010


The APC Metered Rack PDUs help IT and facilities managers more effectively and productively manage power capacity and functionality for critical network, server, and data center equipment.   APC’s new Rack PDUs solve rack-level power needs while incorporating new intelligent features like real power measurement and environmental monitoring all in a space-efficient zero-U form factor – the most shallow depth form factor in the industry. The APC Metered Rack PDU series provides advanced, real-time remote monitoring of connected loads with user-defined alarms to warn of potential circuit overloads before critical IT failures occur, enabling IT managers to proactively monitor and resolve issues.

The APC Next Generation platform of intelligent rack PDUs sets a new industry standard with the ultra low profile design for improved customer access to critical IT equipment and space savings for improved rack-enclosure cable management. The APC Next Generation Metered Rack Power Distribution Units (PDUs) provide active power metering at device, phase, and breaker bank levels for overload protection, capacity planning purposes, and energy efficiency initiatives. User-defined alarm thresholds mitigate risk with real-time local and remote alerts to warn of potential circuit overloads. Metered Rack PDUs provide power utilization data to allow Data Center Managers to make informed decisions on load balancing and right sizing IT environments to lower total cost of ownership. Users can access and configure Metered Rack PDUs through secure Web, SNMP, or Telnet Interfaces, which are complimented by APC Centralized Management platforms using InfraStruxure Central, Operations, Capacity, and Energy Efficiency.  Next Generation Metered Rack PDUs include active power metering and remote alarming with volts, amps, real power (kW), and energy (kWh) measurements. Other features include:

  • Integrated user interactive LCD display interface, replaceable for future upgrades, allows for real-time equipment connectivity & load balancing guidance and provides optional temperature and humidity monitoring with user defined alarms.
  • New ultra low profile, space saving, hydraulic-magnetic breakers maximize IT equipment space and provide the strongest over-current protection available for high temperature rack enclosure environments.  
  • Next Generation Rack PDUs feature locking IEC receptacles and when used with the new locking IEC jumper cords enable the use of an exclusive, easy-to-use and space saving cord retention method, eliminating the need for bulky cable management brackets.
  • Environmental monitoring port allows for temperature and/or humidity monitoring and remote alarming to warn of critical situations.


No comments
Consulting-Specifying Engineer's Product of the Year (POY) contest is the premier award for new products in the HVAC, fire, electrical, and...
Consulting-Specifying Engineer magazine is dedicated to encouraging and recognizing the most talented young individuals...
The MEP Giants program lists the top mechanical, electrical, plumbing, and fire protection engineering firms in the United States.
2014 Product of the Year finalists: Vote now; Boiler systems; Indirect cooling; Integrating lighting, HVAC
High-performance buildings; Building envelope and integration; Electrical, HVAC system integration; Smoke control systems; Using BAS for M&V
Pressure piping systems: Designing with ASME; Lab ventilation; Lighting controls; Reduce energy use with VFDs
Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Consulting-Specifying Engineer case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

Protecting standby generators for mission critical facilities; Selecting energy-efficient transformers; Integrating power monitoring systems; Mitigating harmonics in electrical systems
Commissioning electrical systems in mission critical facilities; Anticipating the Smart Grid; Mitigating arc flash hazards in medium-voltage switchgear; Comparing generator sizing software
Integrating BAS, electrical systems; Electrical system flexibility; Hospital electrical distribution; Electrical system grounding
As brand protection manager for Eaton’s Electrical Sector, Tom Grace oversees counterfeit awareness...
Amara Rozgus is chief editor and content manager of Consulting-Specifier Engineer magazine.
IEEE power industry experts bring their combined experience in the electrical power industry...
Michael Heinsdorf, P.E., LEED AP, CDT is an Engineering Specification Writer at ARCOM MasterSpec.